01 Planning Permission

Full and householder planning applications prepared, submitted and managed end-to-end, including pre-application advice and negotiation with case officers.

  • Pre-app strategy
  • Full drawing package
  • Case officer liaison
  • Conditions discharge
Typically 8–12 weeks to decision Enquire

02 Building Regulations

Technical compliance drawings covering structure, fire, insulation and access, developed in direct liaison with Building Control or an approved inspector.

  • Part A–S compliance
  • Building Control liaison
  • Site inspection coordination
  • Completion certificates
Runs alongside construction Enquire

03 Structural Drawings

Coordinated structural detailing produced alongside consulting structural engineers, covering steelwork, foundations and load paths for extensions and conversions.

  • Engineer coordination
  • Calculations packages
  • Steel schedules
  • Warranty-ready detailing
2–3 weeks once agreed Enquire

04 House Extensions

Rear, side-return and wrap-around extensions designed to add space and light without losing the character of the existing house.

  • Permitted development review
  • Party wall coordination
  • Full planning package
  • Interior integration
4–8 weeks to submission Enquire

05 Loft Conversion

Dormer, hip-to-gable and mansard conversions that maximise headroom and light while respecting the roofline and neighbouring properties.

  • Headroom & stair strategy
  • Roofline studies
  • Party wall coordination
  • Building Regs package
3–6 weeks to submission Enquire

06 Interior Design

Space planning, materials and finishes carried through from architectural shell to finished interior, so nothing gets lost in translation.

  • Space planning
  • Materials & finishes schedules
  • Lighting design
  • Furniture layout
Runs alongside the architecture Enquire

07 Commercial Architecture

Workplace, retail and mixed-use design for commercial clients, from feasibility studies through to fit-out drawings.

  • Feasibility studies
  • Change of use applications
  • Fit-out drawings
  • Landlord liaison
Feasibility typically 2–4 weeks Enquire

08 New Build

Contemporary new-build homes and small residential developments designed from the ground up, from massing studies to construction drawings.

  • Site & massing studies
  • Full planning package
  • Construction drawings
  • Sales & marketing visuals
12–20 weeks to submission Enquire

09 3D Visualisation

Photorealistic renders and walkthroughs that bring a scheme to life for planning committees, funders and clients before a spade hits the ground.

  • Photorealistic stills
  • Walkthrough animation
  • Planning committee visuals
  • Marketing-ready output
1–2 weeks per set Enquire

10 Planning Appeal

Appeals and re-submissions for schemes that were refused first time, built around a clear read of the reasons for refusal.

  • Refusal analysis
  • Appeal statements
  • Re-submission strategy
  • Planning Inspectorate liaison
6–17 weeks depending on route Enquire
common questions

Before you get in touch.

Do you offer a fixed fee?

Most residential projects are quoted as a fixed fee per stage, agreed before you commit to anything.

What happens if planning permission is refused?

We review the reasons for refusal and recommend the strongest route back — usually a revised submission, occasionally a formal appeal.

Do I need a structural engineer as well as an architect?

For most extensions and conversions, yes — we coordinate directly with a consulting engineer as part of the service, so you don't have to manage two firms.

How long does a typical extension take, start to submission?

Most single-storey extensions reach a submission-ready planning package within 4–8 weeks of the first consultation.

Do you work outside London?

Yes — the practice works across England and Wales, with an additional studio presence in Manchester.